BO-Solutions demonstrates that even small SMEs can grow through Make the Future. Together with Agoria and Sirris, they are taking steps towards Eco Factory, digitisation and people-oriented innovation ...
Grid connections take 5 to 7 years. Find out why behind-the-meter and microgrids are becoming a strategic choice for industrial companies and data centres.
Data centres are no longer passive power consumers. Discover how throttling, time-shifting and AI control are turning them into flexible assets within the energy system.
Long-duration energy storage (LDES) is key to a flexible, future-proof energy system. The technology is ready, but policy, market design, and infrastructure still slow large-scale adoption. Discover ...
Power electronics is becoming crucial for resilient power grids. Discover how innovation, AI, and collaboration are accelerating the energy transition in Belgium.
Validate offshore solar equipment before deployment. In the BAMBOO project, Sirris tested a 66 kV transformer in a climatic chamber under extreme temperature and solar heat conditions.
Discover Europe’s largest mobile climate chamber at Sirris. Test and validate large and heavy machines under extreme climatic conditions, from Arctic cold to desert heat.
Find out how sheltered workshops create new opportunities with ReX activities such as repair and reuse, based on six building blocks for collaboration.